SiteMap •  Links • Search        
 Like us in Facebook Follow us on Twitter Subscribe to our RSS feeds View mobile edition of our website. Receive updates in e-mail.
       

 

Statistical Indicators on Philippine Development  

Chapter on Power Sector Reforms

Goal: To implement critical and strategic energy infrastructure
to promote energy independence

Strategy/Target Indicator Accomplishments versus Targets Performance
Increase geothermal capacity and new oil and gas discoveries

Generating capacity of geothermal and natural gas plants

Source: DOE

No improvement seen in installed generating capacity of geothermal plants in the last four years

   

The last five years showed minimal changes in the installed generating capacity of natural gas plants.

 

 

Power generation from geothermal and natural gas plants

Source: DOE

Power generation from geothermal plants has been quite steady in the last five years.

   

Power generation from natural gas plants

 

Construct hydropower plants

Power generation from hydropower plants

Source: DOE

Power generation from hydropower plants showed increasing trend in the last four years.

 

Lower the distribution system loss to 13% in 2005 and to a single digit system loss by 2010 (Electric Cooperatives)

Distribution system loss (%)

Source: NEA

Electric cooperatives' system loss was steady in the last four years and higher than the target

Increase the number of category A+ and A of ECs by 10% in 2010

Number of A+ of Electric Cooperatives

Source: NEA

Number of A+ of ECs went up in 2007 but may not meet the target in 2010

 

 

Number of A of Electric Cooperatives

Source: NEA

Number of A of ECs declined and not likely to meet the target

       

 

Posted: 28 July 2009

StatDev Philippines
Main Page
Summary

 

             
  Email the Webmaster E-mail the webmaster Terms of Use Home • Top of Page  
 

1997-2014, Philippine Statistics Authority - National Statistical Coordination Board
Makati City, Philippines